As part of the council’s proactive plan to prepare the city’s highway network for the future, Calvert Lane’s junction with Anlaby Road has been identified as a priority site for improvement.
It is anticipated that traffic volumes in this area will increase in the years ahead.
The current junction layout acts as a pinch point, causing congestion and delays to journey times.
A scheme has been designed to increase capacity at the junction and roundabout, with the aim of reducing congestion and improving journey reliability while also enhancing safety and active travel facilities for pedestrians and people cycling.
The scheme includes -
- the introduction of signal-controlled crossings, providing dedicated crossing opportunities for pedestrians and people cycling as well as moving cyclists onto off-road facilities
- enhancing walking and cycling infrastructure, including new toucan crossings, a parallel crossing, a new pedestrian refuge island on Calvert Lane and new shared-use footway and cycleway links
- widening the carriageway to provide additional traffic lanes on southbound Calvert Road and northbound Calvert Lane
- extending existing lanes on southbound Calvert Lane and the eastbound and westbound right-turn lanes on Anlaby Road to help reduce queuing
- removal of a limited number of trees, to accommodate widening, with replacement planting provided at a ratio of two new trees for every tree removed
- resurfacing the carriageway and footways to improve their condition, durability and long-term performance
Calvert Lane Capacity Improvement Scheme Latest Developments
From Monday 2 November 2026, a six-week public engagement exercise will be launched to gather feedback from residents, businesses, and commuters on the proposals.
Have your say on the Calvert Lane project
You will be able to attend one of the drop-in sessions that will be announced in November.